Minimising the Cycle Time with Assembly Line Balancing and Worker Assignment: A Case Study in a Medical Device Manufacturer Company. (2025). The Eurasia Proceedings of Science, Technology, Engineering and Mathematics, 35, 133-139. https://doi.org/10.55549/epstem.1804397