Parallel Machine Scheduling with Re-entrant Jobs with Consideration of Set up Times. The Eurasia Proceedings of Science, Technology, Engineering and Mathematics, [S. l.], v. 32, p. 311–319, 2024. DOI: 10.55549/epstem.1602789. Disponível em: https://www.epstem.net/index.php/epstem/article/view/1014. Acesso em: 27 mar. 2026.