Minimising the Cycle Time with Assembly Line Balancing and Worker Assignment: A Case Study in a Medical Device Manufacturer Company. The Eurasia Proceedings of Science, Technology, Engineering and Mathematics, v. 35, p. 133–139, 30 Sep.2025.