[1]
“Minimising the Cycle Time with Assembly Line Balancing and Worker Assignment: A Case Study in a Medical Device Manufacturer Company”, EPSTEM, vol. 35, pp. 133–139, Sep. 2025, doi: 10.55549/epstem.1804397.