Importance of the Factors Affecting the Delays in the Projects of Construction of Collective Housing in Algeria - Program Rent-Purchase

Year 2021, Volume: 12 , 56 - 61, 31.12.2021
https://doi.org/10.55549/epstem.1038365

Abstract

Faced with rapid urbanization and increasing demographic pressure on Algerian cities, housing policy in Algeria has evolved considerably over the past twenty years. However, the construction process is subject to many variables and unpredictable factors, which result in delays in project completion. It is therefore essential to identify and evaluate the relative importance of the main factors affecting delays in collective housing construction projects according to the vision of professionals and experts established in Algeria. Indeed, we focus our attention on the point of view of clients, consultants, designers and contractors to assess the relative importance of 67 delay factors. In total, 37 valid responses were analyzed and ranked. The results indicate that the 5 most important causes are Delay in payment of performed work, Shortage in skilled workers, Bureaucracy in public administrations, Delay in the provision of on-site public services and difficulties in financing the project by contractor. This study is hoped to help the practitioners to implement the mitigation measure at planning stage in order to achieve successful construction projects.

References

  • Ariffin, N. F., Ali, M. I., Ramli, N. I., Jaafar, M. M., Ahmad, S. W., Lim, N. A. S., & Abd Khalid, N. H. (2018, October). The Study on Cause and Effect of Abandoned Housing Project in Selangor. In IOP Conference Series: Materials Science and Engineering 431(8), 082013.
  • Badawy, M., ELNawawy, O., & Mohamed, E. (2020). The cost of late payments in residential buildings in arabian countries. International Journal of Scientific and Engineering Research, Vol 11, issue 3, pp 1392-1398.
  • Durdyev, S. & Hosseini, R. (2018). Causes of delays on construction projects : a comprehensive list. International Journal of Managing Projects in Business, 13(1), 20-46. https://doi.org/10.1108/IJMPB-09-2018-0178.
  • Durdyev, S., Omarov, M., & Ismail, S. (2017). Causes of delay in residential construction projects in Cambodia. Cogent Engineering, 4(1), 1291117. http://dx.doi.org/10.1080/23311916.2017.1291117.
  • Aiyetan, O. A., & Das, D. (2018). System dynamics approach to mitigating skilled labour shortages in the construction industry: A South African context. Construction Economics and Building, 18(4), 45-63. DOI:https://doi.org/10.5130/AJCEB.v18i4.6041.
  • Perera, B. A. K. S., Wijewickrama, M. K. C. S., Goonawardana, P. J. A., & Jayalath, C. (2019). Improving the efficacy of delay notification process of construction projects in Sri Lanka. International Journal of Construction Management, 1-14. https://doi.org/10.1080/15623599.2019.1581593.
  • Chidambaram, R., Narayanan, S. P., & Idrus, A. B. (2012). Construction delays causing risks on time and cost-a critical review. Australasian Journal of Construction Economics and Building, The, 12(1), 37-57.
  • Anantatmula, V. S., & Rad, P. F. (2018). Role of organizational project management maturity factors on project success. Engineering Management Journal, 30(3), 165-178. DOI: 10.1080/10429247.2018.1458208
  • Rachid, Z., Toufik, B., & Mohammed, B. (2019). Causes of schedule delays in construction projects in Algeria. International Journal of Construction Management, 19(5), 371-381. DOI: 10.1080/15623599.2018.1435234
Year 2021, Volume: 12 , 56 - 61, 31.12.2021
https://doi.org/10.55549/epstem.1038365

Abstract

References

  • Ariffin, N. F., Ali, M. I., Ramli, N. I., Jaafar, M. M., Ahmad, S. W., Lim, N. A. S., & Abd Khalid, N. H. (2018, October). The Study on Cause and Effect of Abandoned Housing Project in Selangor. In IOP Conference Series: Materials Science and Engineering 431(8), 082013.
  • Badawy, M., ELNawawy, O., & Mohamed, E. (2020). The cost of late payments in residential buildings in arabian countries. International Journal of Scientific and Engineering Research, Vol 11, issue 3, pp 1392-1398.
  • Durdyev, S. & Hosseini, R. (2018). Causes of delays on construction projects : a comprehensive list. International Journal of Managing Projects in Business, 13(1), 20-46. https://doi.org/10.1108/IJMPB-09-2018-0178.
  • Durdyev, S., Omarov, M., & Ismail, S. (2017). Causes of delay in residential construction projects in Cambodia. Cogent Engineering, 4(1), 1291117. http://dx.doi.org/10.1080/23311916.2017.1291117.
  • Aiyetan, O. A., & Das, D. (2018). System dynamics approach to mitigating skilled labour shortages in the construction industry: A South African context. Construction Economics and Building, 18(4), 45-63. DOI:https://doi.org/10.5130/AJCEB.v18i4.6041.
  • Perera, B. A. K. S., Wijewickrama, M. K. C. S., Goonawardana, P. J. A., & Jayalath, C. (2019). Improving the efficacy of delay notification process of construction projects in Sri Lanka. International Journal of Construction Management, 1-14. https://doi.org/10.1080/15623599.2019.1581593.
  • Chidambaram, R., Narayanan, S. P., & Idrus, A. B. (2012). Construction delays causing risks on time and cost-a critical review. Australasian Journal of Construction Economics and Building, The, 12(1), 37-57.
  • Anantatmula, V. S., & Rad, P. F. (2018). Role of organizational project management maturity factors on project success. Engineering Management Journal, 30(3), 165-178. DOI: 10.1080/10429247.2018.1458208
  • Rachid, Z., Toufik, B., & Mohammed, B. (2019). Causes of schedule delays in construction projects in Algeria. International Journal of Construction Management, 19(5), 371-381. DOI: 10.1080/15623599.2018.1435234
There are 9 citations in total.

Details

Primary Language English
Subjects Engineering
Journal Section Articles
Authors

Rachid Zemra

Early Pub Date September 5, 2021
Publication Date December 31, 2021
Published in Issue Year 2021Volume: 12

Cite

APA Zemra, R. (2021). Importance of the Factors Affecting the Delays in the Projects of Construction of Collective Housing in Algeria - Program Rent-Purchase. The Eurasia Proceedings of Science Technology Engineering and Mathematics, 12, 56-61. https://doi.org/10.55549/epstem.1038365